G.I.WIRE AND M.S. BINDING WIRE
[CODE NO. 1765] J.C. 606
Mild Steel Galvanized steel wire popularly known as galvanized wire have extensive application in various field. It has
got excellent demand in pre-stressed concrete product like railway sleeper, telegraph and telephone, electric pole etc.
and also find ample application in pre-casted cement product like pipes, frames of door and windows etc. On the other
hand it has its own market in the field of strands and also its domestic demand cannot be ignored. The M.S. Wire are
drawn to required dia and then galvanized i.e. coating of zinc is employed on it, gives excellent anti corrosion property
to steel wire.
COST ESTIMATION
lant Capacity 80.00 MT/day
Land & Building (5,000 Sq.Mtr) Rs. 4.45 Cr
Plant & Machinery Rs 3.36 Cr
W.C. for 2 Months Rs.22.34 Cr
Total Capital Investment Rs 30.59 Cr
Rate of Return 86%
Break Even Point 23%
INTRODUCTION
PROPERTIES OF GI WIRE
USES AND APPLICATIONS
B.I.S SPECIFICATION
MARKET POSITION
STATE OF THE STEEL WIRE INDUSTRY:
WIRE ROPE INDUSTRY IN INDIA
WIRE MARKET RESEARCH REPORTS,
ANALYSIS & TRENDS
WIRE AND CABLE INDUSTRY CURRENT TRENDS
MAJOR WIRE AND CABLE INDUSTRY PLAYERS
ANALYSIS OF EXPORTS OF GALVANISED GI WIRE
DETAILED IMPORT DATA OF GALVANISED G.I WIRE
DETAILED EXPORT DATA OF M S BINDING WIRE
MANUFACTURERS/SUPPLIERS
PROCESS FLOW CHART
MANUFACTURING PROCESS OF G.I WIRE
MANUFACTURING PROCESS OF BINDING WIRE
THE HOT DIP GALVANIZING PROCESS
HOT DIP GALVANIZED COATING
HOT DIP GALVANIZED BENEFITS
QUALITY CONTROL OF G.I WIRE AND BINDING WIRE
PLANT LAYOUT
PRINCIPLES OF PLANT LAYOUT
PLANT LOCATION FACTORS
EXPLANATION OF TERMS USED IN THE PROJECT REPORT
SUPPLIERS OF PLANT AND MACHINERY
DG SETS
SUPPLIERS OF RAW MATERIALS
APPENDIX – A :
1. COST OF PLANT ECONOMICS
2. LAND & BUILDING
3. PLANT AND MACHINERY
4. FIXED CAPITAL INVESTMENT
5. RAW MATERIAL
6. SALARY AND WAGES
7. UTILITIES AND OVERHEADS
8. TOTAL WORKING CAPITAL
9. COST OF PRODUCTION
10. PROFITABILITY ANALYSIS
11. BREAK EVEN POINT
12. RESOURCES OF FINANCE
13. INTEREST CHART
14. DEPRECIATION CHART
15. CASH FLOW STATEMENT