TYPES OF WAGON:- (1) COVERED WAGON: Covered wagon is a wagon characterized by its closed construction (solid sides all the way up and roof) and by the safety it provides for the goods conveyed in it (possibility of padlocking and sealing). Closed Type Freight Wagons for transportation of all classes of General Goods, Food Grains, Bagged Cement etc. CONSTRUCTION OF COVERED WAGON:- A. SIDES: Sides are made up of side panels and side stanchions, which are attached to the underframe by crib angles/riveting strips /welding strips. They include top copings, doors, door fittings, label holders, rain protection angles above swing doors, door striking plates and anti bleeding device below the flap doors. B. ENDS: Ends are similar in construction to sides in that they consist of end panels, end stanchions, top copings and in some cases, intermediate copings. Attachment to the underframe is by means of end floor angles and through the stanchions. Covered wagons are provided with ventilators at the upper end of body ends. Corner stanchions connect the ends with the sides. C. ROOF: Roofs of covered wagons consist of roof sheets and carlines. Roof sheets are much thinner than the sheets used for the body sides and end panels. D. DOOR: Each side of the wagon is provided with door for manual unloading. The doors consist of swing doors at the top with label holder hinged to the angles on the sides and flap doors at the bottom, hinged at the bottom with Anti bleeding device.

COST ESTIMATION

Plant Capacity                           12 Nos/Day  
Land & Building (80000 sq.mt)     Rs. 57.04 Cr
Plant & Machinery                    Rs. 85.81 Cr
Working Capital for 2 Months   Rs. 97.06 Cr
Total Capital Investment          Rs. 243.15 Cr
Rate of Return                         16%
Break Even Point                     65%


INTRODUCTION    
(1) ACCORDING TO IT’S UNDER GEAR    
(2) ACCORDING TO ITS UTILITY    
TYPES OF WAGON    
(1) COVERED WAGON    
CONSTRUCTION OF COVERED WAGON    
A. SIDES    
B. ENDS    
C. ROOF    
D. DOOR    
CLOSED TYPE – BCN, BCNA, BCNAHS, BCNHL    
BCN    
BCNA    
BCNA-HS    
BCCN/BCCNA/BCCNB    
BCCN    
(2) OPEN WAGON    
A. SIDES    
B. ENDS    
C. DOORS    
BOXN WAGON –    
BOXNHA    
BOXNHS    
BOXN CR    
BOXNLW    
BOXNHL    
(3) FLAT WAGON    
CONSTRUCTION OF FLAT WAGON    
A. ENDS    
B. SIDE STANCHION    
FLAT TYPE –    
(4) TANK WAGON    
TANK TYPE –    
B.I.S. SPECIFICATION    
PROCESS FLOW CHART    
MANUFACTURING PROCESS FOR BOXNHL WAGON    
DESCRIPTION ABOUT BOXHNL WAGON    
DETAILS SALIENT FEATURES OF BOXNHL WAGON    
3. BOGIE:-    
4. BRAKE GEAR:-    
5. RUNNING GEAR:-    
STANDARD FEATURES OF ‘BOXNHL’ WAGON    
(1) UNDER FRAME:    
MAIN PARTS OF UNDERFRAME ARE:-
(2) CENTER SILL:    
(3) SIDE BODY:    
(4) END BODY:    
(5) DOORS:    
(6) BOGIE:    
BOXHNL WAGON HAS CAS NUB BOGIE    
FIGURE  BOGIE GENERAL ARRANGEMENT FOR CASNUB    
FIGURE  BOGIE GENERAL ARRANGEMENT CASNUB    
7. CENTRE BUFFER COUPLER    
ADVANTAGES OF CBC:-    
COUPLER BODY:    
KNUCKLE:    
(8) BRAKE SYSTEM    
AIR BRAKE SYSTEM:    
A) DISTRIBUTOR VALVE:    
B) BRAKE CYLINDER:    
C) CUT OFF ANGLE COCK:    
D) DIRT COLLECTOR:    
E) RESERVOIR:    
F) METAL PIPES AND JOINTS:    
G) SLACK ADJUSTER:    
MAIN STEPS FOR FABRICATION    
MAIN PROCESS    
THE MAIN PROCESS HAS FOLLOWING STEPS ARE GIVEN BELOW    
(1) CUTTING    
(A). GUILLOTINING    
THE FOLLOWING GUILLOTINE CLEARANCE SETTINGS ARE GIVEN
   FOR GUIDANCE:-    
(B) PLASMA CUTTING    
(A) PLASMA CUTTING:-    
(B) CNC PLASMA CUTTING:-    
CUTTING GASES    
(C) ABRASIVE CUT – OFF WHEELS    
(D) ARC-AIR GOUGING    
(E) POWDER CUTTING    
(F) SLITTING    
(G) COLD SAWING    
(H) BLANKING AND PUNCHING    
(I) DRILLING    
(2) STRAGHTENING    
STRAIGHTENING OF IRSM-44:    
(3) PRESSING    
(A) HYDRAULIC PRESS:-    
(B) POWER HAMMER:-    
(C) DROP HAMMER:-    
(4) WELDING    
(A) ARC WELDING:-    
ARC WELDING CIRCUIT:-    
DEFETS OF ARC WELDING:-    
1. OVERLAP:-    
2. UNDERCUT:-    
3. POROSITY:-    
4. SPATTER:-    
5. CRATER:-    
(B) GAS METAL ARC WELDING (GMAW)/MIG:-    
DEFECTS OF MIG WELDING:-    
1. OVERLAP:-    
2. UNDERCUT:-    
3. POROSITY:-    
4. SPATTER:-    
5. CRATER:-    
IN A WAGON, VARIOUS PARTS ARE WELDED AS PRESCRIBED FOLLOWING
WELDING OF IRS  M-44    
(A) WELDING PROCESS    
(B) WELD REPAIRS    
(C) POST WELD CLEANING    
(D) MECHANICAL CLEANING    
(E) WELDING PROCEDURE:-    
GENERAL PRECAUTIONS IN WELDING OF STAINLESS STEEL    
WELDABILITY ISSUES:    
PRECAUTIONS DURING WELDING:    
PRECAUTIONS AFTER WELDING:    
QUALITY REQUIREMENTS OF WELDING –    
FABRICATION OF DIFFERENT PARTS    
(1) CENTER SILL    
3 FINISHED CENTER SILL SET    
Z-SECTION    
CENTER PART OF CENTRE SILL    
END PART OF CENTRE SILL    
FIXTURE OF CENTRE SILL    
(2) UNDERFRAME    
UNDER FRAME STRUCTURE    
(3) BODY END    
BODY END WITH VENTILATOR AND PRESSINGS    
FIXTURE OF BODY END    
(4) BODY SIDE    
BODY SIDE FIXTURE    
BODY SIDE    
(5) DOORS    
DOORS    
(7) BRAKING SYSTEM    
SLACK ADJUSTER     AUXILIARY RESERVOIR    
DISTRIBUTOR VALVE AND CONTROL BRAKE CYLINDER    
LEVER ASSEMBLY PARTS   EMPTY LOAD ADJUSTER    
SHOE BRAKES    
BRAKING PROCESS:-    
(6) FINAL ASSEMBLY    
PROCEDURE:-    
A) REMOVAL:-    
B) INSTALLATION:-    
GENERAL DATA:-    
(7) FINISHING (SHOT BLASTING)    
(A) SURFACE PREPARATION    
SHOT BLASTING CHAMBER    
(B) PAINTING OF WAGON BODY AND UNSER FRAME    
FOR STAINLESS STEEL    
PRECAUTIONS TO BE TAKEN IN WORK AREA    
PRECAUTIONS TO BE TAKEN IN STORAGE    
PRECAUTIONS TO BE TAKEN IN STORAGE OF IRS: M 44 STEELS    
(8) TESTING    
(1) RADIOGRAPHY TEST (RT):-    
(2) DI-PENETRATION TEST:-    
(3) COMPRESSIVE STRENGTH TEST:-    
SETUP FOR TEST    
LOAD PROVIDING MACHINE    
(4) WATER TESTING:-    
WATER TESTING UNIT    
(6) VISUAL INSPECTION:-    
(7) BRAKING SYSTEM TEST:-    
PRESSURE GENERATING UNIT    
MARKET POSITION    
FREIGHT CAN SPEED UP ECONOMIC GROWTH    
SUPPLY CONSTRAINTS HIT INDIAN RAILWAYS’ INDUCTION
   OF FREIGHT WAGONS    
RAILWAY MINISTER SAYS INDIA FACING SHORTAGE OF WAGONS    
INDIAN RAILWAYS INTENDS TO PURCHASE 38,000 WAGONS    
SUPPLY CONSTRAINTS HIT INDIAN RAILWAYS’ INDUCTION OF FREIGHT WAGONS    
RAILWAYS MULLS BUYING NEW WAGONS WORTH RS 9,000 CRORE
    IN 3 YEARS    
PLANT LAYOUT    
MANUFACTURERS/SUPPLIERS OF RAILWAY WAGON    
SUPPLIERS OF RAW MATERIALS    
SUPPLIERS OF IRS M-44 SS SHEET    
SUPPLIERS OF CRF SECTION    
SUPPLIERS OF COMPLETE CAS NUB BOGIE ASSEMBLY    
SUPPLIERS OF AIR BRAKE ASSEMBLY    
SUPPLIERS OF WELDING ELECTRODES
SUPPLIERS OF PAINS MATERIALS    
SUPPLIERS OF PLANT AND EQUIPMENTS    
POWER PRESS    
SHEARING MACHINE    
ROLLING MACHINE    
FLYPRESS    
BENDING MACHINE    
MECHANICAL PRESS    
FORGING PRESSES    
FORGING HAMMER    
UNCOILING MACHINE    
SHEET LAVELING MACHINE    
PUNCHING PRESS    
CNC PLASMA CUTTING MACHINE    
MILLING MACHINE    
CNC LATHE MACHINE    
BOARING MACHINE    
POWER HACKSAW    
GRINDING MACHINE    
PROJECTION WELDER    
SEAM WELDING MACHINE    
SPOT WELDING MACHINE    
GAS WELDING EQUIPMENTS    
MIG WELDING MACHINE    
SUPPLIERS OF DRILLING, LATHE,TAPING MACHINES    
EOT CRANE    
POWER TRANSFORMER    
ELECTRICAL PANEL    
ELECTRIC MOTOR    
COOLING TOWER    
EFFULENT TREATMENT PLANT    
AIR POLLUTION CONTROL EQUIPMENTS    
AIR CONDITIONING EQUIPMENTS    
AIR COMPRESSORS    160
PLATFORM WEIGHING MACHINE    
MATERIAL HANDLING EQUIPMENTS    
FIRE FIGHTING EQUIPMENTS    
SHOT BLASTING MACHINE    
JIGS AND FIXTURE    
SUBMERSIBLE WATER PUMP    


APPENDIX – A:

01.    PLANT ECONOMICS    
02.    LAND & BUILDING     
03.    PLANT AND MACHINERY    
04.    OTHER FIXED ASSESTS    
05.    FIXED CAPITAL    
06.    RAW MATERIAL    
07.    SALARY AND WAGES    
08.    UTILITIES AND OVERHEADS
09.    TOTAL WORKING CAPITAL    
10.    TOTAL CAPITAL INVESTMENT    
11.    COST OF PRODUCTION    
12.    TURN OVER/ANNUM    
13.    BREAK EVEN POINT     
14.    RESOURCES FOR FINANCE    
15.    INSTALMENT PAYABLE IN 5 YEARS    
16.    DEPRECIATION CHART FOR 5 YEARS    
17.    PROFIT ANALYSIS FOR 5 YEARS    
18.    PROJECTED BALANCE SHEET FOR (5 YEARS)    
 

Get Free Sample Project Report

Fill in your details to receive a sample industrial project report and explore how our consultancy can help you plan your business professionally.

By submitting this form, you agree to receive communication from our consultancy team regarding industrial project reports and business consultancy services.

Ready to Start Your Industrial Business?

Speak with our experts and get personalized guidance for your manufacturing business idea, project planning, machinery selection, and investment strategy.

Our consultancy team will connect with you to understand your business requirements and guide you on the next steps.