Detailed Project Report on injection moulding for plastic components with tool room

Detailed Project Report on injection moulding for plastic components with tool room


INJECTION MOULDING FOR PLASTIC COMPONENTS WITH TOOL ROOM

EIRI/DFR/8131 J.C.5995


     In  fact  each  vehicles require different number  of  Dash Board Instruments.  Two wheelers (Mopeds, Scooters etc)   require only speedometers, ammeter  metres, so Dase Board (Plastic) Panel is  needed for the same also from wheelers like cars,  and  Jeeps require  battery  condition  indications,  oil  pressure  gauges, lesgeratre  gauges, hour cum  running per meter etc, cum  running per  meter  etc,  or and above the  instrument  required  by  the wheelers.  Police  van  require  telephone  dials and   Telephone operating switches also.  Dase Board Plastic panels are important for every Automobile vehicles.


COST ESTIMATION


Plant capacity                                     450.00 Kg/day 

Land & Building (1000 Sq.Mtr)  Rs. 32.00 Lacs    

Plant & Machinery                              Rs. 16.64 Lacs 

Working Capital for 1 Month            Rs. 10.67 Lacs 

Total Capital Investment                  Rs. 62.71 Lacs 

Rate of Return                                    80%

Break Even Point                               34%


CONTENTS


1.   INTRODUCTION                                  

2.   USES AND APPLICATIONS                         

3.   MARKET SURVEY                                 

4.   PRESENT MANUFACTURERS                         

5.   B.I.S SPECIFICATIONS                          

6.   MANUFACTURING PROCESS                         

7.   PROCESS FLOW SHEET                            

8.   TOOL ROOM FOR VARIOUS ITEMS                   

9.   PLANT LAYOUT                                  

10.  SUPPLIERS PLANT OF MACHINERY                   

11.  SUPPLIERS OF RAW MATERIAL                     


APPENDIX – A:


01. PLANT ECONOMICS

02. LAND & BUILDING

03. PLANT AND MACHINERY

04. OTHER FIXED ASSESTS

05. FIXED CAPITAL

06. RAW MATERIAL

07. SALARY AND WAGES

08. UTILITIES AND OVERHEADS

09. TOTAL WORKING CAPITAL

10. TOTAL CAPITAL INVESTMENT

11. COST OF PRODUCTION

12. TURN OVER/ANNUM

13. BREAK EVEN POINT

14. RESOURCES FOR FINANCE

15. INSTALMENT PAYABLE IN 5 YEARS

16. DEPRECIATION CHART FOR 5 YEARS

17. PROFIT ANALYSIS FOR 5 YEARS

18. PROJECTED BALANCE SHEET FOR (5 YEARS)


Get Free Sample Project Report

Fill in your details to receive a sample industrial project report and explore how our consultancy can help you plan your business professionally.

By submitting this form, you agree to receive communication from our consultancy team regarding industrial project reports and business consultancy services.

Ready to Start Your Industrial Business?

Speak with our experts and get personalized guidance for your manufacturing business idea, project planning, machinery selection, and investment strategy.

Our consultancy team will connect with you to understand your business requirements and guide you on the next steps.