GREASE MANUFACTURING
[EIRI/EDPR/1600] J.C. 399
These consist of a dispersion of a metallic soap in a lubricating oil and vary from mobile ligands to hard solids. Sodium or Calcium soaps are more commonly employed but for special purposes aluminium or lithium soaps are used. Greases are used for lubricating bearings and other moving parts where lube oil would be unsuitable.
Primary components of greases are mineral oils & soaps. The oil consists of varying proportions of paraffinic naphthenic and aromatic hydrocarbon. Soaps used in grease may be derived from animal or vegetable oils or fatty acids, wool grease, resin or petroleum acids. apart from this variety of other compounds are added to lubricating greases to improve specific properties.such components are corrosion and rust inhibiton, and wear prevention agents. a grease thus produced is properly thicked in order that it remains in contact with the moving surfaces and does not leak out under pressure. Grease acts as a seal against dirt, dripping and spattering is eliminated, minimizes starting frictions.
COST ESTIMATION
Plant Capacity 1.00 MT/Day
Land & Building (1000 Sq.Mtr) Rs. 1.50 Cr
Plant & Machinery Rs. 32.00 Lacs
Working Capital for 3 Month Rs. 55.46 Lacs
Total Capital Investment Rs.2.45 Cr
Rate of Return 31%
Break Even Point 49%
CONTENTS
INTRODUCTION
USES AND APPLICATIONS
PROPERTIES AND CHARACTERISTICS
BIS SPECIFICATION
MARKET SURVEY
PRODUCTION OF LUBRICATING OIL AND GREASES IN INDIA
APPARENT CONSUMPTION OF LUBRICATING OIL & GREASES
ESTIMATED DEMAND
DEMAND SUPPLY GAP
PRESENT MANUFACTURE/SUPPLIERS
CONSTITUENTS OF GREASE
FORMULATIONS OF GREASES LEAD BASE LUBRICANT GREASES
MANUFACTURING PROCESS
FORMULATION OF GREASES
THE MANUFACTURING PROCESS OF GREASE
MANUFACTURING PROCESS LITHIUM GREASE
PROCESS DETAILS OF GREASE MANUFACTURING IN
CONTACTOR REACTOR
PERFORMANCE TEST OF GREASE
PROCESS FLOW DIAGRAM FOR THE MANUFACTURE OF GREASE
PLANT LAYOUT
RAW MATERIAL CALCULATIONS FOR GREASE
TIN CONTAINERS FOR GREASE PACKAGING
COMPLETE PLANT SUPPLIERS
SUPPLIERS OF RAW MATERIALS
SUPPLIERS OF PLANT & MACHINERIES
APPENDIX – A:
01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)
Fill in your details to receive a sample industrial project report and explore how our consultancy can help you plan your business professionally.
Speak with our experts and get personalized guidance for your manufacturing business idea, project planning, machinery selection, and investment strategy.