LOW CARBON FERRO MANGANESE ON ALUMINO THERMIC PROCESS
[EIRI/EDPR/0450] J.C. 9009
INTRODUCTION
Metallurgical knowledge had its beginnings in the Stone Age when same ancient craftsman first recognized the difference in behaviour amongst certain of the "rocks" with which he was working. The stones familiar to this primitive aetisan were hard and brittle and were capable of being fashioned into tools and weapons only by fedious shaping, chip by chip. His first encoumter with metal then, undoubtedly native copper or gold, must have been an exciting experiences.
Here was a susbstance which, instead of fructuring, yields to the blows of this stone hammer. Here was a material which could be formed much more precisely, which was pleasing to the eyes, which could be worked to a keener edge and which more over somehow acquired greater atrength the more it was worked.
From the use of native metal to the deliberate reduction of an ore by carbon is a long step, and one which is the subject of much interesting speculation. It seems likely that the first such reduction was accidental possibly the result of a fortunate combination of circumstances. In which the heat of a comp fire, together with carbon from the charted logs succeeded in reducing copper ore contained in the surrounding atones an other occasions the stones may have contained additional metals such as tin and the relationship between the fire, the charged logs, and the particular types os stones was recognized, and the discover, the first metallurgist, began to produce metals at will.
COST ESTIMATION
Plant Capacity 35 MT/Day
Land & Building (4000 sq.mt.) Rs. 1.51 Cr
Plant & Machinery Rs. 48.25 Lac
Working Capital for 2 Months Rs. 5.94 Cr
Total Capital Investment Rs. 8.18 Cr
Rate of Return 30%
Break Even Point 59%
CONTENTS
INTRODUCTION
USES AND APPLICATIONS
MARKET POSITION
PRESENT MANUFACTURERS
DEMAND POSITION
FERRO MANGANESE
PROCESS OF MANUFACTURE
FLOW SHEET
PRINCIPLES OF PLANT LAYOUT
PLANT LOCATION FACTORS
EXPLANATION OF TERMS USED IN THE PROJECT REPORT
PROJECT IMPLEMENTATION SCHEDULES
SUPPLIERS OF RAW MATERIALS
ADDRESS OF MACHINERY & EQUIPMENT
APPENDIX – A:
01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)
Fill in your details to receive a sample industrial project report and explore how our consultancy can help you plan your business professionally.
Speak with our experts and get personalized guidance for your manufacturing business idea, project planning, machinery selection, and investment strategy.