BIO GAS PRODUCTION & BOTTLING PLANT
(1500 CUBIC PETER PER DAY)
[CODE NO.1650]
Energy is becoming a scarce and costly input in the world. Oil which accounts for a sizeable portion of our energy consumption, has been making a very heavy tax on our foreign exchange resources. Other than coal, we must also find alternate resources of energy centered around solar, wind, tidal and bio-gas. An effective bio-gas programme leads to efficient use of cow dung for gas recovery and partial supplement to plant nutrient requirement. Bio-gas programme leads to improvement in rural living including rural sanitation.
Conventional bio-gas digesters set up in India were predominantly of the Khadi Village Industries Commission Model. Recently Janta Bio-gas plant designed by Planning Research and Action Division (PRAD) of State Planning Institute, Lucknow based on bio gas technology has proved to be comparatively more economical. Several Janta Biogas plants have been constructed in Uttar Pradesh and a few in Haryana.
COST ESTIMATION
Plant Capacity 1500.00 CUBIC METER PER DAY/day
Land & Building (2000 Sq.Mtr) Rs 1.40 Cr
Plant & Machinery Rs 1.00 Cr
W.C. for 3 Months Rs. 40.00 Lacs
Total Capital Investment Rs 4.86 Cr
Rate of Return 26%
Break Even Point 50%
MARKET SURVEY CUM DETAILED TECHNO
ECONOMIC FEASIBILITY REPORT covers
• Introduction
• Properties
• BIS (Bureau of Indian Standard) Specifications & Requirements
• Uses & Applications
• Present Indian Market Position
• Expected Future Demand
• Export & Import Statistics Data
• Names and Addresses of Existing Units (Present Manufactures)
• List of Plant & Machineries
• Miscellaneous Items and Accessories
• Instruments, Laboratory Equipments and Accessories
• Electrification, Electric Load and Water
• Maintenance, Suppliers/Manufacturers of Plant and Machineries
• Process of Manufacture with formulae if applicable
• Flow Sheet Diagram
• List of Raw Materials
• Availability of Raw Materials
• Requirement of Staff & Labour
• Personnel Management
• Skilled & Unskilled Labour
• Requirement of Land Area
• Built up Area
• Plant Layout.
along with financial details as under:
Summary of Capital Cost of Project
Land & Side Development Exp.
Buildings
Plant & Machineries
Misc. Fixed Assets
Technical Know how Fees & Exp.
Preliminary Expenses
Pre-operative Expenses
Provision for Contingencies
below mentioned financial statements (Annexure) will be for 5 to 10 Years
Annexure :: Cost of Project and Means of Finance
Annexure :: Output, Profitability and Cash Flow Chart
Annexure :: Assessment of Working Capital requirements
Annexure :: Sources of Finance
Annexure :: Balance Sheets
Annexure :: Break-Even Analysis and profitability analysis.
Annexure :: Quantitative Details-Output/Sales/Stocks
Annexure :: Sales Realisation
Annexure :: Raw Material Cost
Annexure :: Other Raw Material Cost
Annexure :: Packing Material Cost
Annexure :: Consumables, Store etc.,
Annexure :: Employees Expenses
Annexure :: Fuel Expenses
Annexure :: Power/Electricity Expenses
Annexure :: Repairs & Maintenance Exp.
Annexure :: Other Mfg. Expenses
Annexure :: Administration Expenses
Annexure :: Selling Expenses
Annexure :: Depreciation Charges - Profitability
Annexure :: Depreciation Charges
Annexure :: Interest and Repayment - Term Loans
Annexure :: Tax on Profit
Annexure :: Assumptions for Profitability workings
Annexure :: Assessment of Working Capital
Engineers India Research Institute (EIRI) is a renowned name in the industrial world for offering technical and financial consultancy services.
EIRI services are:
Detailed Feasibility Reports
New Project Identification
Project Feasibility and Market Study
Identification of Lucrative Industrial Project Opportunities
Preparation of Project Profiles / Pre-Investment and Detailed Feasibility Studies,
Market Surveys / Studies, Market Survey Cum Detailed Techno-Economic Feasibility Reports
Project Reports in CD Roms
Identification of Plant /Process/Machinery and Equipment, Industrial General Guidance for setting up new industrial projects.
Our most up-to-date and Technologically Advanced Industrial Project Reports, categorized with respect to Financial Outlays and Sector – wise Classification are immensely useful for :
Existing Small or Medium Scale Industrialists facing competition from large houses
Young Entrepreneurs dreaming to start their own industrial enterprise
Young Graduates and Professionals wishing to begin their career
Industrialists interested in Debottlenecking their capacities & New Product – Lines
Large Industrial Houses pursuing Expansion, Growth and Diversification Plans
Latest Books
Fill in your details to receive a sample industrial project report and explore how our consultancy can help you plan your business professionally.
Speak with our experts and get personalized guidance for your manufacturing business idea, project planning, machinery selection, and investment strategy.