SOYA PROTEIN ISOLATE (POWDER) (PRODUCTION RATE -10 TPD)
[EIRI/EDPR/4597] J.C.: 2814XL
INTRODUCTION
Soya Protein is a protein that is isolated from soybean. It is made from soybean meal that has been dehulled and defatted. Soya Protein is generally regarded as being concentrated in protein bodies, which are estimated to contain at least 50-60% of the total soybean soya flour/flakes
Among the different constituents of the seed, only the oil has so far been considered of value for human consumption and the oil cake residues left behind after extraction have been used mainly as live-stock feed and manure.
Scientific research conducted during the past few decades in this country and elsewhere has shown that the oilseed meal, if properly prepared and processed, can serve as a valuable protein supplement to human dietaries and that the proteins isolated from oilseed meals are likely to find extensive use in specialized food preparations suitable for feeding infants and children.
COST ESTIMATION
Plant Capacity 10 Ton/Day
Land & Building (4940 sq.mt.) Rs. 6.17 Cr
Plant & Machinery Rs. 4.48 Cr
Working Capital for 1 Month Rs. 3.34 Cr
Total Capital Investment Rs. 14.42 Cr
Rate of Return 79%
Break Even Point 32%
CONTENTS
INTRODUCTION
USES AND APPLICATIONS
PROPERTIES/CHARACTERISTICS
COMPOSITION OF SOYA PROTEIN
TECHNICAL INDEX OF SOYA PROTEIN
RAW MATERIAL & PRODUCT YIELD
MARKET OVERVIEW
BIS SPECIFICATION
PRESENT MANUFACTURERS OF SOYA PROTEIN
BASIC PRINCIPLE - SOYA PROTEIN
MANUFACTURING PROCESS STEPS/PROCESS FLOW
ENGINEERING DESIGN CONSIDERATIONS
ETP FACILITY
SEWAGE AND WASTE TREATMENT FACILITY
PLANT & MACHINERY
UTILITIES REQUIREMENT (ESTIMATED - MONTH)
PRINCIPLES OF PLANT LAYOUT
PLANT LOCATION FACTORS
PROJECT MANAGEMENT
RAW MATERIALS SUPPLIER
PLANT & MACHINERY SUPPLIER/CONSULTANT/CONTRACTOR
GOVT. LICENSE DETAILS
WASTE GENERATION & MANAGEMENT
POTENTIAL RISKS
ANTICIPATED ENVIRONMENTAL IMPACTS
MITIGATION MEASURES (PROPOSED)
HEALTH SAFETY & ENVIRONMENT
SAFETY & OCCUPATIONAL MEASURE
ENVIRONMENTAL/SAFETY LIABILITY
PROPOSED IMPLEMENTATION SCHEDULE
PROJECT FINANCIALS
PRELIMINARY PLANT LAYOUT
CONCLUSIONS
APPENDIX – A:
01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)
Fill in your details to receive a sample industrial project report and explore how our consultancy can help you plan your business professionally.
Speak with our experts and get personalized guidance for your manufacturing business idea, project planning, machinery selection, and investment strategy.