SODIUM METABISULPHITE
[CODE NO.4365]
Sodium metabisulfite or sodium pyrosulfite (IUPAC spelling; Br. E. sodium metabisulphite or sodium pyrosulphite) is an inorganic compound of chemical formula Na2S2O5. The substance is sometimes referred to as disodium metabisulfite. It is used as a disinfectant, antioxidant, and preservative agent.
Sodium disulfite can be prepared by treating a solution of sodium hydroxide with sulfur dioxide. When conducted in warm water, Na2SO3 initially precipitates as a yellow solid. With more SO2, the solid dissolves to give the disulfite, which crystallises upon cooling.
SO2 + 2 NaOH ? Na2SO3 + H2O
SO2 + Na2SO3 ? Na2S2O5
Which yields a residue of colourless solid Na2S2O5
Sodium pyrosulphite is sometimes considered to be a solid for of sulphur dioxide since it contains 67% SO2. The principal use of sodium pyrosulphite is as a reducing agent and as a preservative for various food stuffs. In these applications it is being used as a convenient solid replacement for sulphur dioxide.
A potential use of both sulphur dioxide and sodium pyrosulphite that has high growth possibilities for Western Canada is as a preservative for silage. In the case of grain silage (oats and barley) sulphur dioxide reduces the degree of fermentation (and hence of loss of potential food energy) that lead to acids giving natural preservation and, in the case of grass silage that is low in fermentable carbohydrates, the sulphur dioxide provides a reliable method of preservation that may bedifficult to achieve naturally.
COST ESTIMATION
Plant Capacity 5 Ton/Day
Land & Building (1200 sq.mt.) Rs. 3.44 Cr
Plant & Machinery Rs. 83 Lac
Working Capital for 2 Months Rs. 1.28 Cr
Total Capital Investment Rs. 5.77 Cr
Rate of Return 32%
Break Even Point 51%
APPENDIX – A:
01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)