RESIDENTIAL APARTMENTS
[EIRI/EDPR/4667] J.C.: 2884XL
INTRODUCTION
“Magnum Group” introduces ourselves as builder, promoters, real estate’s developers especially for medium class people belonging to Delhi and NCR. “Magnum Group” offer economical and innovative solutions to your property needs with in-depth study and expertise of team of professionals. We analyze the markets and opportunities to expedite transactions. “Magnum Group” was conceived in the year 2004.We have 6 nos. Private Limited company i.e.
• Magnum Buildcon India Private Limited
• PKG Estates PrivateLimited
• Tempest Construction PrivateLimited
• Pratham Buildcon Private Limited
• RMS Builders Private Limited
All the company is spear headed by well experienced Civil Engineer Mr. P. K. Goel who has 55 years practical experience in making of Residential, Commercial and Industrial Buildings in India and Abroad. He is well associated by his son Mr. Puneet Goel, who is having vast experience in civil works, administrative skills and he has been also making Residential and Commercial Building in Delhi/ NCR from last 30 years and he is also well associated who has also enormous experience in the field of building construction from last 25 years and he has very good managerial proficiency. Over the years we have developed a distinguished reputation for excellent craftsmanship and service. Our work ethic, experience and commitment have made us one of the most trusted builders in Delhi & NCR. We recognize and understand the need of our clients and assist them in finding a suitable property which suits their requirement and budget.
COST ESTIMATION
Plant Capacity 10,50,000 sq.ft/Annum
Land & Building (24,663 sq.mt.) Rs. 432.20 Cr
Plant & Machinery Rs. 3.66 Cr
Working Capital for 3 Months Rs. 58.09 Lac
Total Capital Investment Rs. 436.78 Cr
Rate of Return 105%
Break Even Point 18%
CONTENT
INTRODUCTION ABOUT GROUP
RESIDENTIAL PROJECT UNDER CONSTRUCTION -“MAGNUM OASIS GREEN”
EXECUTIVE SUMMARY
PICTURES OF SITE OFFICE OF THE PROJECT
“MAGNUM OASIS GREEN” IN THE COMPANY “RMS BUILDERS PRIVATE LIMITED”
“FRONT ELEVATION”
TOWER A –TENTH FLOOR SLAB CASTED
TOWER B –TENTH FLOOR SLAB CASTED
PROJECT NEAR COMPLETION COMMERCIAL -“MAGNUM’S STAR CRUISE MALL CUM MULTIPLEX”
BROCHURE “MAGNUM STAR CRUISE MALL
EXECUTIVE SUMMARY
FRONT ELEVATION
INTERIOR PICS
RESIDENTIAL PROJECT NEAR COMPLETION-“THE ALIEN COURT”
MARKET SIZE
INVESTMENTS/DEVELOPMENTS
GOVERNMENT INITIATIVES
ROAD AHEAD
KEY REGULATIONS AND POLICIES IN INDIA
ENVIRONMENTAL LEGISLATIONS
OTHER APPLICABLE LAW
STATE LAWS
MUNICIPALITY LAWS
AIRPORTS AUTHORITY OF INDIA ACT, 1994, AS AMENDED (“AAI ACT”)
EXCISE LAWS
INTELLECTUAL PROPERTY LAWS
FOREIGN INVESTMENT REGULATIONS
LABOUR LAW LEGISLATIONS
INFRASTRUCTURE PLAN
SPECIFICATION OF SERVICES
WATER SUPPLY AND PLUMBING WORKS
WATER REQUIREMENT, SOURCE AND WATER BALANCE
WATER CALCULATIONS
WATER BALANCE (NON MONSOON PERIOD)
WATER BALANCE (MONSOON PERIOD)
SOURCE OF WATER SUPPLY
THE PROPOSED SOURCES OF WATER ARE:
DETAILS OF WATER PRODUCTION AND CONSUMPTION IN CIS- HINDON AREA (CHA)
THE SOURCES OF WATER IDENTIFIED FOR WATER SUPPLY SYSTEM ARE:
WATER SOURCE:
QUALITY STANDARDS
WATER SUPPLY
WATER TREATMENT SCHEMATIC FLOW DIAGRAM OF WTP
SALIENT FEATURES OF SEWERAGE SYSTEM
SEWERAGE SYSTEM
SEWAGE COLLECTION & TREATMENT
WASTE WATER RECYCLING
ESTIMATED CHARACTERISTICS OF TREATED AND RAW SEWAGE
SEWAGE TREATMENT UNITS
PRIMARY TREATMENT
SECONDARY TREATMENT
PROCESS FLOW DIAGRAM FOR SEWAGE TREATMENT PLANT (STP)
A. TERTIARY TREATMENT
B. SLUDGE CONDITIONING
POWER REQUIREMENT, SOURCE AND BACKUP
ENERGY CONSERVATION MEASURES ADOPTED
SOLID WASTE COLLECTION / DISPOSAL PLAN
SOLID WASTE GENERATION
COLLECTION AND SEGREGATION OF WASTE
DISPOSAL
TREATMENT OF WASTE
WASTE MANAGEMENT FLOW DIAGRAM (CONSTRUCTION PHASE)
WASTE MANAGEMENT FLOW DIAGRAM (OPERATIONAL PHASE)
HAZARDOUS WASTE
E-WASTE
COLLECTION AND STORAGE
TRAFFIC MANAGEMENT PLAN AND PARKING FACILITIES
FIRE FIGHTING SYSTEM
FOLLOWING ITEMS ARE ENVISAGED FOR FIREFIGHTING:
SYSTEM DESCRIPTION
SPRINKLER SYSTEM
PORTABLE FIRE EXTINGUISHERS
WATER STORAGE TANKS
FIRE STATION LOCATION FROM THE SITE
DETAILS OF CONSTRUCTION MATERIALS
LIST OF MACHINERY USED DURING CONSTRUCTION
DESCRIPTION OF ENVIRONMENT
PHYSICAL RESOURCES
CLIMATE
DRAINAGE AND PHYSIOGRAPHY
SOIL TYPE
SOIL PROFILE OF GHAZIABAD
SOIL EROSIONAZIABAD
HYDROLOGY OF STUDY AREA
GROUND WATER STATUS OF GHAZIABAD DISTRICT:
DETAILS OF WATER PRODUCTION AND CONSUMPTION IN CIS- HINDON AREA (CHA)
QUALITY OF SURFACE WATER:
SURFACE WATER QUALITY OF HINDON RIVER, (CPCB)
QUALITY OF GROUND WATER
WATER SUPPLY:
WATER QUALITY CRITERIA AND STANDARDS FOR FRESHWATER CLASSIFICATION (CPCB, 1979)
GEOGRAPHY AND LAND USE
(A) GEOGRAPHY
(B) LAND USE
LAND USE OF THE GHAZIABAD AS PER MASTER PLAN 2021 EXISTING LAND USE OF GHAZIABAD
LAND USE PATTERN OF GHAZIABAD (MASTER PLAN 2021)
(A) SEISMO-TECTONIC APPRAISAL OF THE AREA
MAP SHOWING SEISMIC ZONES IN INDIA, 2002
AIR ENVIRONMENT
CLIMATE AND METEOROLOGY
RELATIVE HUMIDITY
WIND SPEED AND DIRECTION
MONTHLY WIND SPEED (KM/H)
WIND ROSE DIAGRAM (PROMINENT WIND DIRECTION - FROM NORTH WEST)
TEMPERATURE
TEMPERATURE (MAX, MEAN & MIN) OF THE YEAR 2021 (JAN- DEC)
AIR QUALITY OF GHAZIABAD.
AVERAGE AMBIENT AIR QUALITY DATA OF GHAZIABAD
NOISE ENVIRONMENT
NATIONAL AMBIENT NOISE LEVEL STANDARDS
ECOLOGICAL RESOURCES
HABITAT ASSESSMENT
THE STUDY AREA WAS DIVIDED INTO TWO ZONES AS GIVEN BELOW:
FLORAL COMMUNITY
CORE ZONE:
I) STUDY AREA IN 10 KM RADIUS AROUND THE PROJECT SITE:
LIST OF PLANTS INCLUDING HERBS, SHRUBS AND TREES
FAUNAL COMMUNITY
I. CORE ZONE
II. BUFFER ZONE (10 KM RADIUS)
1) AMPHIBIANS
2) REPTILES
3) MAMMALS
4) AVES
5) BUTTERFLIES
LIST OF SPECIES IN BUFFER ZONE (10 KM RADIUS)
AGRICULTURAL LAND
WASTE LAND
GRASSLAND
VEGETATION IN AND AROUND HUMAN SETTLEMENT
AVENUE TREES AND PROJECTION
AGRICULTURAL CROPS
PROTECTED AREAS
SOCIO ECONOMIC ENVIRONMENT
POPULATION
DEMOGRAPHIC PROFILE ALONG WITH DECADAL GROWTH: GHAZIABAD
PRINCIPLES OF PROJECT LAYOUT
PLANT LOCATION FACTORS
PRIMARY FACTORS
1. RAW-MATERIAL SUPPLY:
2. MARKETS:
3. POWER AND FUEL SUPPLY:
4. WATER SUPPLY:
5. CLIMATE:
SPECIFIC FACTORS
6. TRANSPORTATION:
A. AVAILABILITY OF VARIOUS SERVICES AND PROJECTED RATES
7. WASTE DISPOSAL:
8. LABOR:
9. REGULATORY LAWS:
10. TAXES:
11. SITE CHARACTERISTICS:
12. COMMUNITY FACTORS:
13. VULNERABILITY TO WARTIME ATTACK:
14. FLOOD AND FIRE CONTROL:
EXPLANATION OF TERMS USED IN THE PROJECT REPORT
1. DEPRECIATION:
2. FIXED ASSETS:
3. WORKING CAPITAL:
4. BREAK-EVEN POINT:
5. OTHER FIXED EXPENSES:
6. MARGIN MONEY:
7. TERM LOANS:
8. TOTAL LOAD:
9. LAND AREA/MAN POWER RATIO:
ORGANIZATION CHART
LIST OF PLANT AND EQUIPMENT SUPPLIERS/MANUFACTURERS
AIR CONDITIONING & REFRIGERATION UNITS
CONSULTANT
PROJECT LOCATION: TRONICA CITY
LAYOUT- TRONICA CITY
LIST OF DOCUMENTS REQUIRED TO GET FOR LICENSES
OTHER LICENSES REQUIRED FOR THE SETUP:
IMPLEMENTATION SCHEDULE
THE KEY FACTORS THAT WOULD FACILITATE SUCCESSFUL AND TIMELY PROJECT IMPLEMENTATION ARE –
IMPLEMENTATION STRATEGY
IMPLEMENTATION SCHEDULE
PRE-PROJECT ACTIVITIES INCLUDE:
PROJECT IMPLEMENTATION SCHEDULE
APPENDIX – A:
01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)
Fill in your details to receive a sample industrial project report and explore how our consultancy can help you plan your business professionally.
Speak with our experts and get personalized guidance for your manufacturing business idea, project planning, machinery selection, and investment strategy.