Petrochemical Based Solvents (Capacity: 20000 Litre per day)

Petrochemical Based Solvents (Capacity: 20000 Litre per day)

PETROCHEMICAL BASED SOLVENTS (EXPANSION PROJECT)

[EIRI/EDPR/4537] J.C.: 2754(20,000 Ltr), 2754(60,000 Ltr)


INTRODUCTION

Petroleum Based Solvents are a class of substance that dissolves a solute (a chemically different liquid, solid or gas), resulting in a solution. A solvent is usually a Liquid. The quantity of solute that can dissolve in a specific volume of solvent varies with temperature. Common uses for petrochemical solvents are in dry cleaning (e.g., tetrachloroethylene), as paint thinners (e.g., toluene, turpentine), as nail polish removers and glue solvents (acetone, methyl acetate, ethyl acetate), in spot removers (e.g., hexane, petrol ether), in detergents (citrus terpenes) and in perfumes (ethanol).The present product is Industrial Solvent which is widely used in Paint, Printing Ink, Glues, Cleaning and Degreasing, Automotive, Dyes and Pigments, Adhesives, Chemical Manufacture, etc. Solvents find wide applications in Chemical, Pharmaceutical, Oil and Gas Industries, Including in Chemical Synthesis and Purification Processes. 

There are many classes of Industrial Solvents: those having aromatic content of 20% or less and those having aromatic content of more than 20%. Our present scope and interest is with the class containing more than 20% aromatic content which are commonly and commercially branded as ‘thinner’.


COST ESTIMATION

Plant Capacity                   20,000 Ltr./Day  

Land & Building (1250 sq.mt.)        Rs. 1.50 Cr    

Plant & Machinery                          Rs. 3.20 Cr 

Working Capital for 0.5 Months      Rs. 1.54 Cr 

Total Capital Investment                 Rs. 6.50 Cr 

Rate of Return                                  74%

Break Even Point                             33%


CONTENTS

INTRODUCTION

PRODUCTS

MARKET POTENTIAL

UTILITIES, SERVICES & EQUIPMENTS

RAW MATERIAL

MANUFACTURING PROCESS STEPS

PROCESSING & PRODUCT YIELD

PRODUCT SPECIFICATIONS (TYPICAL)

ENGINEERING DESIGN CONSIDERATIONS

HAZARDS AND PROCESS SAFETY MANAGEMENT

PLANT/MACHINERY (BROADLY)

SUPPLIERS OF PLANT & MACHINERIES/TURNKEY

WASTE EFFLUENT/FLUE GAS EMISSION

SEWAGE AND WASTE WATER EFFLUENT

PRINCIPLES OF PLANT LAYOUT

PLANT LOCATION FACTORS

ANTICIPATED ENVIRONMENTAL IMPACTS

MITIGATION MEASURES (PROPOSED)

HEALTH SAFETY AND ENVIRONMENT

PROPOSED IMPLEMENTATION SCHEDULE

PROJECT FINANCIALS

CONCLUSIONS


APPENDIX – A:

01. PLANT ECONOMICS

02. LAND & BUILDING

03. PLANT AND MACHINERY

04. OTHER FIXED ASSESTS

05. FIXED CAPITAL

06. RAW MATERIAL

07. SALARY AND WAGES

08. UTILITIES AND OVERHEADS

09. TOTAL WORKING CAPITAL

10. TOTAL CAPITAL INVESTMENT

11. COST OF PRODUCTION

12. TURN OVER/ANNUM

13. BREAK EVEN POINT

14. RESOURCES FOR FINANCE

15. INSTALMENT PAYABLE IN 5 YEARS

16. DEPRECIATION CHART FOR 5 YEARS

17. PROFIT ANALYSIS FOR 5 YEARS

18. PROJECTED BALANCE SHEET FOR (5 YEARS)


Get Free Sample Project Report

Fill in your details to receive a sample industrial project report and explore how our consultancy can help you plan your business professionally.

By submitting this form, you agree to receive communication from our consultancy team regarding industrial project reports and business consultancy services.

Ready to Start Your Industrial Business?

Speak with our experts and get personalized guidance for your manufacturing business idea, project planning, machinery selection, and investment strategy.

Our consultancy team will connect with you to understand your business requirements and guide you on the next steps.