MEDICAL DEVICES (VACUUM BLOOD COLLECTION TUBE, HYPODERMIC NEEDLES, IV CANNULA AND BUTTERFLY NEEDLES)
[EIRI/EDPR/4466]
A vacuum blood collection tube is a sterile glass or plastic test tube with a coloured rubber stopper creating a vacuum seal inside of the tube, facilitating the drawing of a predetermined volume of liquid. Vacuum tubes may contain additives designed to stabilize and preserve the specimen prior to analytical testing. Tubes are available with a safety-engineered stopper, with a variety of labeling options and draw volumes. The colour of the top indicates the additives in the vial.
A Blood Collection Tube Manufacturing is of BCT/ Vacutainer which is a sterilized glass or plastic test tube with a coloured rubber stopper which creates a vacuum seal inside the tube supporting the draw of a fixed volume of liquid. It is also referred to as the “Vacutainer”. Vacutainer tubes consist of additives which are designed to preserve the specimen earlier to the accurate testing.
These tubes or containers have a security planned plug with en number of labelling alternatives and draw volumes. The shading on the top shows the added substances of the containers or tubes. Vacutainer tubes may contain extra substance that preserves blood from preparing in a medical research laboratory. Utilizing an inappropriate tube can make the blood test unusable for the intended purpose.
COST ESTIMATION
Plant Capacity 4,00,000 Nos/Day
Land & Building (2000 sq.mt.) Rs. 2.50 Cr
Plant & Machinery Rs. 20.53 Cr
Working Capital for 2 Months Rs. 2.84 Cr
Total Capital Investment Rs. 27.14 Cr
Rate of Return 57%
Break Even Point 42%
CONTENTS
INTRODUCTION
USES/APPLICATIONS
MARKET OVERVIEW
SPECIFICATIONS
MANUFACTURING STEPS/PROCESS FLOW/QUALITY CONTROL
MAJOR MACHINERIES USES
SUPPLIER OF RAW MATERIALS
SUPPLIERS OF PLANT AND MACHINERY
PLANT LOCATION FACTORS
ENGINEERING DESIGN CONSIDERATIONS
PRINCIPLES OF PLANT LAYOUT
UTILITY REQUIREMENT (ESTIMATED) - MONTH
GENERATION AND MANAGEMENT OF WASTES
WASTE TREATMENT FACILITY
SEWAGE & WASTE WATER EFFLUENT
SAFETY REQUIREMENT
ANTICIPATED ENVIRONMENTAL IMPACTS
MITIGATION MEASURES (PROPOSED)
SAFETY & OCCUPATIONAL MEASURE
PROPOSED IMPLEMENTATION SCHEDULE
PROJECT FINANCIALS
PRELIMINARY PLANT LAYOUT
APPENDIX – A:
01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)
Fill in your details to receive a sample industrial project report and explore how our consultancy can help you plan your business professionally.
Speak with our experts and get personalized guidance for your manufacturing business idea, project planning, machinery selection, and investment strategy.