CURCUMIN (FROM TURMERIC)
[EIRI/EDPR/4330] J.C.: 2513XL
INTRODUCTION
Curcumin, the natural yellow pigment in turmeric, is isolated from the rhizomes of the plant Curcuma longa. It constitutes about 2-4% of the composition of turmeric. In the south and southeast tropical Asian countries, turmeric has been used for centuries as a spice to give the specific flavor and yellow color to curry. Turmeric became a very important spice to mankind when it was observed that the addition of turmeric powder in food preparation preserved its freshness and nutritive value. The use of turmeric became more popular when it was found to act as a therapeutic agent for various illnesses. In the Ayurvedic system of medicine, turmeric is used as a tonic and as a blood purifier. Its role in the treatment of skin diseases and its ability to soften rough skin resulted in the prolific use of turmeric in topical creams and bath soaps in India. Turmeric is also used in home remedies in the treatment of cuts, wounds, bruises, and sprains. Its use as an anti-inflammatory and antimicrobial agent has been recognized for more than a century.
The importance of turmeric in medicine took a new twist when it was discovered that the dried rhizome of Curcuma longa is very rich in phenolic, whose structures have been identified as curcuminoids. Phenolics are known to possess antioxidant properties. Free radical mediated damage to biological systems is recognized as the initiating agent for many diseases, such as cardiovascular diseases, cancer, and arthritis.
COST ESTIMATION
Plant Capacity 60 Kg/Day
Land & Building (4000 sq.mt.) Rs. 3.15 Cr
Plant & Machinery Rs. 4.29 Cr
Working Capital for 1 Month Rs. 1.06 Cr
Total Capital Investment Rs. 8.94 Cr
Rate of Return 26%
Break Even Point 66%
CONTENTS
INTRODUCTION
TURMERIC GRADES
INDIA TURMERIC GRADES
BENEFITS OF CURCUMIN
PHARMACOLOGICAL PROPERTIES OF CURCUMIN
USES/APPLICATIONS
ANTI-INFLAMMATORY PROPERTY
ANTIOXIDANT PROPERTIES
EFFECT OF CURCUMIN ON PLATELET AGGREGATION
PROPERTIES OF CURCUMIN
BIS SPECIFICATION
MARKET OVERVIEW
GLOBAL MARKET POSITION AND DEMAND
ASIA PACIFIC IS EXPECTED TO WITNESS GROWTH OVER 12.5% UP TO 2024
OPPORTUNITY & RISE OF CURCUMIN
RAW MATERIALS SCENARIO (INDIA AND GLOBAL)
INTERNATIONAL SCENARIO
TURMERIC HAS BEEN FOUND TO HAVE THE COMPOSITION AS SHOWN IN TABLE BELOW
FORMULATION
MANUFACTURING PROCESS
PROCESS FLOW
STEP-A
STEP-B
STEP-C
STEP-D
STEP-E
STEP-F
PLANT & MACHINERY (BROADLY)
UTILITIES REQUIREMENT (ESTIMATED - MONTH)
WASTE EFFLUENT/FLUE GAS EMISSION (ESTIMATED)
GREEN BELT
WATER
EMISSION
WASTE MANAGEMENT (ESTIMATED)
SWOT ANALYSIS (CURCUMIN)
STRENGTH
OPPORTUNITIES
WEAKNESSES
THREAT
LICENSES, CERTIFICATE AND QUALITY CONTROL
FSSAI
AYUSH LICENSE (FOR MULTI PURPOSE EXTRACTION)
NOC
RAW MATERIAL SUPPLIERS
SOLVENT
LABORATORY CHEMICALS
PLANT & MACHINERY SUPPLIERS/CONSULTANT/TURNKEY SUPPLIER
IMPORTED/TURNKEY
CONSULTANT
CRUSHER
EVAPORATORS
FILTER PRESS
BOILERS
LAB TESTING EQUIPMENT
STORAGE TANK
MATERIAL HANDLING EQUIPMENTS
EXTRACTOR
STEAM DISTILATION PLANT
PUMPS
DIGITAL WEIGHING SCALE
OTHER MACHINERY
SUPPLIERS OF EFFLUENT TREATMENT PLANT
D.G. SETS/TRANSFORMERS
SUPPLIERS OF INSTRUMENTATION & PROCESS CONTROL EQUIPMENTS
PRINCIPLES OF PLANT LAYOUT
MAJOR PROVISIONS IN ROAD PLANNING FOR MULTIPURPOSE SERVICE ARE:
PLANT LOCATION FACTORS
PRIMARY FACTORS
RAW-MATERIAL SUPPLY:
MARKETS:
POWER AND FUEL SUPPLY:
WATER SUPPLY:
CLIMATE:
TRANSPORTATION:
WASTE DISPOSAL:
LABOR:
REGULATORY LAWS:
TAXES:
SITE CHARACTERISTICS:
COMMUNITY FACTORS:
FLOOD AND FIRE CONTROL:
PROJECT MANAGEMENT
PROJECT HANDLING
PROJECT SCHEDULING
PROJECT CONSTRUCTION SCHEDULE
POTENTIAL RISKS
ANTICIPATED ENVIRONMENTAL IMPACTS
CONSTRUCTION PHASE
OPERATION PHASE
MITIGATION MEASURES (PROPOSED)
HEALTH SAFETY & ENVIRONMENT
SAFETY & OCCUPATIONAL MEASURE
PROPOSED IMPLEMENTATION SCHEDULE
PROJECT FINANCIALS
PRELIMINARY PLANT LAYOUT
APPENDIX – A:
01. PLANT ECONOMICS
02. LAND & BUILDING
03. PLANT AND MACHINERY
04. OTHER FIXED ASSESTS
05. FIXED CAPITAL
06. RAW MATERIAL
07. SALARY AND WAGES
08. UTILITIES AND OVERHEADS
09. TOTAL WORKING CAPITAL
10. TOTAL CAPITAL INVESTMENT
11. COST OF PRODUCTION
12. TURN OVER/ANNUM
13. BREAK EVEN POINT
14. RESOURCES FOR FINANCE
15. INSTALMENT PAYABLE IN 5 YEARS
16. DEPRECIATION CHART FOR 5 YEARS
17. PROFIT ANALYSIS FOR 5 YEARS
18. PROJECTED BALANCE SHEET FOR (5 YEARS)
Fill in your details to receive a sample industrial project report and explore how our consultancy can help you plan your business professionally.